Sorry, you need to enable JavaScript to visit this website.
Guernsey Grammar - 7

Guernsey Grammar School

Performance
Sport flooring
Education
Client
Guernsey Grammar School
Type
Sport Flooring
Place
Channel Islands
Project type
Sport Flooring
Size
500m2
Products
Taraflex Evolution

Guernsey Grammar School

Ten years doesn’t seem that long, but in truth it’s a short lifetime for most of us. There’s not many products out there that would stand the test of time delivering performance year on year and to the highest standards. Everything from cars through to smart phones all seem to wear out or give up the proverbial ghost at some point. However, when The States of Guernsey in the Channel Islands wanted to source 500m2 of sports flooring for The Guernsey Grammar School and Sixth Form Centre that would be future proof they turned to international flooring specialist Gerflor to provide the solution with their world-class, uber performing Taraflex® Evolution sports flooring for their main sports hall.

Guernsey Grammar - 2

The school itself can trace its history back to 1863, with the current school being the result of the amalgamation of the old Girls’ and Boys’ Intermediate Schools which was opened in 1985. The Sixth Form Centre was opened in 2005. It was built to accommodate the rising number of students wishing to continue their education after GCSEs, studying for AS and A Levels. So, legacy and history play a huge part in the school’s past together with influencing the present and the future. Relying on quality refurbishments that are both future proof and fit for purpose is a key element of any educational buildings requirement.

Taraflex® Evolution

6350 LIGHT CHERRY

1.5 m X 20.5 m

Guernsey Grammar - 1

The school itself can trace its history back to 1863, with the current school being the result of the amalgamation of the old Girls’ and Boys’ Intermediate Schools which was opened in 1985. The Sixth Form Centre was opened in 2005. It was built to accommodate the rising number of students wishing to continue their education after GCSEs, studying for AS and A Levels. So, legacy and history play a huge part in the school’s past together with influencing the present and the future. Relying on quality refurbishments that are both future proof and fit for purpose is a key element of any educational buildings requirement.

Taraflex® Evolution

6350 LIGHT CHERRY

1.5 m X 20.5 m

Guernsey Grammar - 3

The school itself can trace its history back to 1863, with the current school being the result of the amalgamation of the old Girls’ and Boys’ Intermediate Schools which was opened in 1985. The Sixth Form Centre was opened in 2005. It was built to accommodate the rising number of students wishing to continue their education after GCSEs, studying for AS and A Levels. So, legacy and history play a huge part in the school’s past together with influencing the present and the future. Relying on quality refurbishments that are both future proof and fit for purpose is a key element of any educational buildings requirement.

Taraflex® Evolution

6350 LIGHT CHERRY

1.5 m X 20.5 m

Guernsey Grammar - 4

The school itself can trace its history back to 1863, with the current school being the result of the amalgamation of the old Girls’ and Boys’ Intermediate Schools which was opened in 1985. The Sixth Form Centre was opened in 2005. It was built to accommodate the rising number of students wishing to continue their education after GCSEs, studying for AS and A Levels. So, legacy and history play a huge part in the school’s past together with influencing the present and the future. Relying on quality refurbishments that are both future proof and fit for purpose is a key element of any educational buildings requirement.

Taraflex® Evolution

6350 LIGHT CHERRY

1.5 m X 20.5 m

Guernsey Grammar - 5

The school itself can trace its history back to 1863, with the current school being the result of the amalgamation of the old Girls’ and Boys’ Intermediate Schools which was opened in 1985. The Sixth Form Centre was opened in 2005. It was built to accommodate the rising number of students wishing to continue their education after GCSEs, studying for AS and A Levels. So, legacy and history play a huge part in the school’s past together with influencing the present and the future. Relying on quality refurbishments that are both future proof and fit for purpose is a key element of any educational buildings requirement.

Taraflex® Evolution

6350 LIGHT CHERRY

1.5 m X 20.5 m

Guernsey Grammar - 6

The school itself can trace its history back to 1863, with the current school being the result of the amalgamation of the old Girls’ and Boys’ Intermediate Schools which was opened in 1985. The Sixth Form Centre was opened in 2005. It was built to accommodate the rising number of students wishing to continue their education after GCSEs, studying for AS and A Levels. So, legacy and history play a huge part in the school’s past together with influencing the present and the future. Relying on quality refurbishments that are both future proof and fit for purpose is a key element of any educational buildings requirement.

Taraflex® Evolution

6350 LIGHT CHERRY

1.5 m X 20.5 m

"After research into multi-use flooring and receiving samples from various companies I ascertained that Gerflor was the most practical for our needs. We were absolutely delighted, as the installation back in 2007 went very smoothly and created a fantastic transformation"
Chris Dyer, Building Maintenance Manager, Education Services, States of Guernsey
This option will filter the result to display only products that are currently available in stock.